Solar Panels System 50kw/100kWh Cabinet Solar Power Energy Storage System 100kW/215kWh Solution Ess For Factory
Payment Terms
|
T/T
|
EXW
|
30% in advance for deposit payment, the balance payments will be paid before shipment.
|
|
FOB
|
||||
CFR/C&F
|
30% in advance for deposit payment, the balance will be paid against copy of B/L
|
|||
CIF
|
||||
L/C
|
For the amount of one shipment above 50,000 usd, L/C at sight is acceptable.
|
|||
West Union
|
For the amount less than 5000 usd |
|||
Paypal
|
||||
Delivery Time
|
7~25 days after receiving the payment or the deposit payment
|